欧美一卡2卡三卡4卡国产免费_欧美一卡二卡新区乱码工作室_欧美一线a观看_欧美一夜爽爽爽爽爽爽_欧美影院成年免费版_欧美呦交_欧美尤物射精集锦_欧美又粗又大又爽的A片_欧美又粗又大又硬又爽的免费视频_欧美又粗又长又黑的A片_欧美又大又粗又爽色情_欧美又大又硬又长又粗A片_欧美又大又长又粗又爽A片_欧美又黑又大AAA毛片_欧美又黄又爆的A片_欧美又长又粗A片DVD_欧美欲乱妇135_欧美在线观看 cao38_欧美真人性做爰一二区欧美影院_欧美最猛黑人AAAAA片_欧美最猛激情性AAAAA_欧美最骚最疯日B视频观看_欧美做人爱A毛片_欧美做爰免费大片视频_欧亚欧洲码国产_欧亚又粗又大又黄的A片_欧州又粗又大又长八A片_欧洲5卡6卡7卡老狼在线_欧洲se图_欧洲版的红楼梦

您現(xiàn)在的位置:
裝飾首頁 > 裝飾指南 > 深圳辦公室裝修

怎么在裝飾過程中進(jìn)行施工檢驗(yàn)

來源:博盛達(dá)    發(fā)布時(shí)間:2013-9-19 11:08:56

            怎么在裝飾過程中進(jìn)行施工檢驗(yàn)
  歡喜居家,中秋佳節(jié),家人聚會,正準(zhǔn)備裝飾新家的裝友挑選家裝公司后就會十分重視裝飾質(zhì)量,歡喜空間小博士這期帶給裝友的正是怎么檢驗(yàn)和監(jiān)督裝飾質(zhì)量的常識。通常房子裝飾別離分為水電檢驗(yàn)、泥木檢驗(yàn)和竣工檢驗(yàn):如何在裝修過程中進(jìn)行施工驗(yàn)收
  1、水電檢驗(yàn)需求注意:強(qiáng)弱電通路測驗(yàn),強(qiáng)弱電箱鎖扣及線管固定,電線分色,鏡前燈彎管出墻,線盒鎖扣、連接器、線盒留根,頂部線管固定,水管、電管、燃?xì)夤?、插座相互間的距離及固定,水管壓力24小時(shí)測驗(yàn),現(xiàn)場核對工程量,剩下資料清點(diǎn);
  2、瓷磚鋪貼后外觀鋪貼排版要合理,施工過程中砂漿豐滿,門檻石刺進(jìn)墻體3-5厘米,廚衛(wèi)需求墻磚壓地磚,瓷磚平坦度在3毫米內(nèi),墻面瓷磚筆直度在2毫米內(nèi),瓷磚陰陽角差錯(cuò)在3毫米內(nèi),瓷磚接縫凹凸差在0.5毫米。木作吊頂注意石膏板對接采用錯(cuò)縫,根底木龍骨要調(diào)查是不是是烘干的龍骨,注意重視環(huán)保象征;
  3、竣工檢驗(yàn)首要涉及到木門、地板、衣柜、櫥柜等,木門裝置檢驗(yàn)?zāi)軌蚪?jīng)過對角線測距,地板裝置后感官平坦、無坍陷、無損傷等,衣柜裝置和墻體接口合理,柜門滑動(dòng)順滑、平開門開關(guān)靈敏。
  How in the decorative process for construction inspection
   Happy home, the Mid-Autumn Festival, family gatherings, is preparing to decorate a new home improvement company selected after loading the Friends will attach great importance to the quality of decor, this issue brings joy Space Doctor installed exactly how friendly decorative quality inspection and supervision of common sense. Usually divided into hydro test house decoration parting CARPENTER inspection and completion of inspection:
   1, water testing requirements Note: the strength of electrical pathway tests, the strength of electrical box lock and fixed line pipe, wire separation, mirror light pipe out of the wall, box lock, connectors, junction boxes remain the root, the top fixed line pipe, water pipes, electric pipes, gas pipes, sockets and fixed distance from each other, 24 hours water pressure test, on-site verification of quantities, the remaining data inventory;
   2, after the appearance of the tiling tiling layout to be reasonable, the construction process mortar plump, stone threshold pierce the wall 3-5 cm, kitchen wall tiles demand pressure, brick, tile flatness within 3 mm, wall tiles straight degree to 2 mm, tile Yang angle error of 3 mm, the tile joints differential unevenness of 0.5 mm. Note wooden ceiling gypsum board butt joints using wrong, root wood keel is not to investigate the keel is dried, environmentally conscious attention symbol;
   3, the completion of the primary test involves doors, flooring, wardrobes, cabinets, etc., can be tested through the diagonal wooden devices ranging, flooring after installation senses flat, no collapse, no damage, etc., wardrobe unit and wall interfaces reasonable, doors smooth sliding, swing switch sensitive.
 

西充县| 沧州市| 和顺县| 喜德县| 沅江市| 淄博市| 五家渠市| 辉县市| 固阳县| 通江县| 庆元县| 长武县| 长治县| 老河口市| 云龙县| 阳城县| 鄂温| 萝北县| 汶上县| 雷州市| 理塘县| 孝感市| 桑植县| 天台县| 晋城| 伊宁市| 收藏| 红桥区| 河北区| 晴隆县| 山阳县| 怀安县| 镇宁| 略阳县| 惠东县| 甘南县| 霍城县| 墨脱县| 贵港市| 安新县| 奉节县|